We started Spring Break with General Conference and this was how the first session went. Having candy out was the key to keeping them plugged in for a lot longer than usual.
In between sessions on Saturday we drove up Provo Canyon to pick up some free firewood and also put a deposit down on a reception facility. (WHAT?!) And as an added bonus we had a quick visit from my Aunt Gayla and Uncle Craig.
|
This sweet gentlemen was awesome and bore his testimony to us three different times in the best ways. Good stuff! |
These pieces of wood were far bigger than I realized. Our neighbor wasn't deterred though and was more than happy for a little more firewood to add to his pile.
|
This is how these boys 'play' together. |
We also did a little dog sitting for a few days and all the kids really loved having this pretty husky here for a visit. Unfortunately our dog wasn't a big fan but we made it work.
|
This was the only safe way for Charlie to walk the dog, in the back yard. |
McClane finally lost his other top tooth!
And of course Greg had plenty to keep him busy with the basement bathroom. Thankfully he had the whole week off so a lot got done.
|
Here's a few before photos. |
|
The shower is complete and now on to the floor! |
This was the start of the fun stuff we planned with the kids, a movie! We didn't see the movie in the photo but we did see "Boss Baby" and everyone liked it.
And we even splurged on a little lunch at In N Out.
Our second fun activity was a trip to a trampoline fun center. This is a great way to wear the kids out!
|
So much FUN! |
And to keep Greg and myself from going completely insane and to give Greg one last little 'hurrah' before work gets crazy we took a minute to relax in Tahiti! (Ok, so maybe it's a theme room at a nearby B & B but it was still fun.)
|
There was actual sand on the floor and an aquarium built into the 'deck'. |
Now back to work!
|
The floor tile took a lot less time than the shower tile. I LOVE it! |
And our last fun activity, swimming!
While we were swimming Greg kept working and made a ton of progress. There is a bright light at the end of this 'remodel tunnel'. Just a few more finishing touches and this bathroom will be done!
It's sad to see our Spring Break coming to an end but I do think we made the most of the week, which is why it went so quickly. Lets hope Greg is ready for work/water season. And lets hope the kids can survive the rest of the school year, only 35 school days left!